Module 16: Recovery — Closing Gaps After the Fact
Everything through Module 14 is preventive. This module is for when prevention already failed — you’re in scoping, or worse, in a kickoff, and you notice a topic has no real L2 behind it. First move: don’t guess forward. The instinct under time pressure is to write a plausible L2 statement yourself and move on. This is bridge overuse under a different trigger — a confirmation that was never actually offered to the client for correction. Resist it. The reconstruction technique. Often you have L1 narrative and scattered L3 detail, but the L2 that should connect them was never authored. Work backward: given the process and the details that exist, what L2 statement would make both of them make sense? Draft it — but treat this draft as unconfirmed, not as a discovered fact. The recovery bridge. Take the reconstructed L2 back to the client explicitly, and say so: “Looking back at what we discussed, I want to confirm something we may not have nailed down — it sounds like the system needs to X. Is that accurate?” Naming that it’s a gap being closed, rather than presenting it as settled, protects the relationship and gets a more honest answer. Triage when there isn’t time to recover everything. Not every gap is equally urgent. Prioritize by:
- Topics with L3 detail already committed to a build (highest risk — work is happening against an unconfirmed requirement)
- Topics with conflicting stakeholder signals (Module 7) that were never resolved
- Everything else, which can often wait for the next natural touchpoint What this is not: a license to skip the discipline in Modules 1–9 because “I can always recover it later.” Recovery costs more than prevention — it requires re-opening a topic the client may have believed was closed, which spends trust that a well-run discovery call wouldn’t have needed to spend.